01Firm 02Services 03Projects 04Clients 05Contact
026 Industrial

Construction of new plastics factory at Mesaieed Industrial City (MIC)

All projects
Construction of new plastics factory at Mesaieed Industrial City (MIC)
About the work

Industrial project consists of Workshop (5464m2), Raw material storage (1680m2), Pipe storage (1200m2), Maintenance (1231m2), (5464m2), Electrical services (233m2), administration (829m2) and 2 guardhouse buildings. The project will serve HEPWORTH production facility for plastic piping and miscellaneous plastic equipment production. The production consists mainly of 4 molding production lines and supplementary equipments (i.e. cooling, compressed air). Additionally warehouse (with/out racks) for raw material, finished products, spare parts and consumables is included. The above buildings will be located in a MIC plot of 21613m2. The construction was split in two phases.