01Firm 02Services 03Projects 04Clients 05Contact
098 Infrastructure and Utilities

Muraikh Area Sewerage Phase 4

All projects
Muraikh Area Sewerage Phase 4
About the work

The project area of 2,590 hectares is partially served by a network of existing sewers divided into 9 drainage areas. The project consists of ± 150 KM of foul sewerage piping varying in size between 200 mm and 800 mm, and varying in depth between 2 m to 11 m, including portions to be constructed by micro-tunneling. This project will serve the existing, ongoing and planned developments to the future design horizon of 2035 by extending and upgrading the existing sewerage facilities.