The Project is to provide Consultancy Engineering services and studies to prepare a general master plan for Al Taif University located in Saysad Area in Taif city and cover an area of 17Km2. The scope of works includes: satisfy the future development and can be summarized as follows: 1x40MVA, 1x35MVA), 58 Substations, 14 Km MV cables). Lighting Poles, 274 Km LV cables) Pumping Stations, 3 Strategic Tanks). pressure lines, 2 Pumping Stations). Culverts). BioShaft Technology Advanced Attached Growth Process.
- Design of Infrastructure works inside the University Campus to
- Topographical and Geotechnical surveys.
- New Road Works, Traffic Study, Road Assessment Report.
- New Electrical MV Network (New Switchgear Buildings (2x70MVA,
- New Electrical LV Network (209 Lighting Panels, 8939 Street
- New Telecom Network (258 Km Optical Fiber cables)
- New Potable Network (107 Km Pressure pipes, 847 Fire Hydrant, 2
- New Sewer Network (70 Km of sewer gravity lines, 3 Km of sewer
- New Drainage Network (195 Km Channels, 5 Km Interceptors, 35m
- New Sewage Treatment Plant (6x2500m3/day capacity) using
- New Irrigation Network (53 Km Pressure pipes).